Documentation

This is machine translation

Translated by Microsoft
Mouseover text to see original. Click the button below to return to the English verison of the page.

Note: This page has been translated by MathWorks. Please click here
To view all translated materals including this page, select Japan from the country navigator on the bottom of this page.

days360e

Days between dates based on 360-day year (European)

Syntax

  • NumDays = days360e(StartDate,EndDate)
    example

Description

example

NumDays = days360e(StartDate,EndDate) returns the number of days between StartDate and EndDate based on a 360-day year (that is, all months contain 30 days). If EndDate is earlier than StartDate, NumDays is negative. This day count convention is used primarily in Europe. Under this convention, all months contain 30 days.

Either input argument can contain multiple values, but if so, the other must contain the same number of values or a single value that applies to all. For example, if StartDate is an N-row character array of date character vectors, then EndDate must be an N-by-1 vector of integers or a single integer. Determine the Number of Days Between Two Dates Given a Basis of 30/360 Based on European ConventionNumDays is then an N-by-1 vector of date numbers.

Examples

collapse all

Determine the NumDays using date character vectors for StartDate and EndDate for the month of January.

StartDate = '1-Jan-2002';
EndDate = '1-Feb-2002';
NumDays = days360e(StartDate, EndDate)
NumDays =

    30

Determine the NumDays in the month of January using a datetime array for StartDate.

NumDays = days360e(datetime('1-Jan-2002','Locale','en_US'), '1-Feb-2002')
NumDays =

    30

Determine the NumDays using a vector for EndDate.

MoreDays = ['15-mar-2000'; '15-apr-2000'; '15-jun-2000'];
NumDays = days360e('15-jan-2000', MoreDays)
NumDays =

    60
    90
   150

Related Examples

Input Arguments

collapse all

Start date, specified as a scalar or an N-by-1 or 1-by-N vector using serial date numbers, date character vectors, or datetime arrays.

Data Types: double | char | datetime

End date, specified as a scalar or an N-by-1 or 1-by-N vector using serial date numbers, date character vectors, or datetime arrays.

Data Types: double | char | datetime

Output Arguments

collapse all

Number of days between two dates given a basis of 30/360 based on European convention, returned as a scalar or an N-by-1 or 1-by-N vector containing the number of days.

NumDays returns as a double for serial date number, date character vector, or datetime inputs for StartDate and EndDate.

References

Addendum to Securities Industry Association, Standard Securities Calculation Methods: Fixed Income Securities Formulas for Analytic Measures. Vol. 2, Spring 1995.

Introduced before R2006a

Was this topic helpful?