varbacktest

Create varbacktest object to run suite of value-at-risk (VaR) backtests

Description

The general workflow is:

  1. Load or generate the data for the VaR backtesting analysis.

  2. Create a varbacktest object. For more information, see Create varbacktest.

  3. Use the summary function to generate a summary report for the given data on the number of observations and the number of failures.

  4. Use the runtests function to run all tests at once.

  5. For additional test details, run the following individual tests:

    • tl — Traffic light test

    • bin — Binomial test

    • pof — Proportion of failures

    • tuff — Time until first failure

    • cc — Conditional coverage mixed

    • cci — Conditional coverage independence

    • tbf — Time between failures mixed

    • tbfi — Time between failures independence

    For more information, see VaR Backtesting Workflow.

Creation

Syntax

vbt = varbacktest(PortfolioData,VaRData)
vbt = varbacktest(___,Name,Value)

Description

example

vbt = varbacktest(PortfolioData,VaRData) creates a varbacktest (vbt) object using portfolio outcomes data and corresponding value-at-risk (VaR) data. The vbt object has the following properties:

  • PortfolioDataNumRows-by-1 numeric array containing a copy of the PortfolioData

  • VaRDataNumRows-by-NumVaRs numeric array containing a copy of the VaRData

  • PortfolioID — String containing the PortfolioID

  • VaRID1-by-NumVaRs string vector containing the VaRIDs for the corresponding columns in VaRData

  • VaRLevel1-by-NumVaRs numeric array containing the VaRLevels for the corresponding columns in VaRData.

Note

  • The required input arguments for PortfolioData and VaRData must all be in the same units. These arguments can be expressed as returns or as profits and losses. There are no validations in the varbacktest object regarding the units of these arguments.

  • If there are missing values (NaNs) in the data for PortfolioData or VaRData, the row of data is discarded before applying the tests. Therefore, a different number of observations is reported for models with different number of missing values. The reported number of observations equals the original number of rows minus the number of missing values. To determine if there are discarded rows, use the 'Missing' column of the summary report.

example

vbt = varbacktest(___,Name,Value) sets Properties using name-value pairs and any of the arguments in the previous syntax. For example, vbt = varbacktest(PortfolioData,VaRData,'PortfolioID','Equity100','VaRID','TotalVaR','VaRLevel',.99). You can specify multiple name-value pairs.adds optional name-value pair arguments.

Input Arguments

expand all

Portfolio outcomes data, specified as a NumRows-by-1 numeric array, NumRows-by-1 table, or a NumRows-by-1 timetable with a numeric column containing portfolio outcomes data. PortfolioData input sets the PortfolioData property.

Note

The required input arguments for PortfolioData and VaRData must all be in the same units. These arguments can be expressed as returns or as profits and losses. There are no validations in the varbacktest object regarding the units of these arguments.

Data Types: double | table | timetable

Value-at-risk (VaR) data, specified using a NumRows-by-NumVaRs numeric array, NumRows-by-NumVaRs table, or a NumRows-by-NumVaRs timetable with numeric columns. VaRData input sets the VaRData property.

If VaRData has more than one column (NumVaRs> 1), the PortfolioData is tested against each column in VaRData. By default, a 0.95 VaR confidence level is used for all columns in VaRData. (Use VaRLevel to specify different VaR confidence levels.)

The convention is that VaR is a positive amount. Therefore, a failure is recorded when the loss (the negative of the portfolio data) exceeds the VaR, that is, when

 -PortfolioData > VaRData

For example, a VaR of one million (positive) is violated whenever there is an outcome worse than a one-million loss (the negative of the portfolio outcome, or loss, is larger than the VaR).

Negative VaRData values are allowed, however negative VaR values indicate a highly profitable portfolio that cannot lose money at the given VaR confidence level. That is, the worst-case scenario at the given confidence level is still a profit.

Note

The required input arguments for PortfolioData and VaRData must all be in the same units. These arguments can be expressed as returns or as profits and losses. There are no validations in the varbacktest object regarding the units of these arguments.

Data Types: double | table | timetable

Name-Value Pair Arguments

Specify optional comma-separated pairs of Name,Value arguments. Name is the argument name and Value is the corresponding value. Name must appear inside single quotes (' '). You can specify several name and value pair arguments in any order as Name1,Value1,...,NameN,ValueN.

Example: vbt = varbacktest(PortfolioData,VaRData,'PortfolioID','Equity100','VaRID','TotalVaR','VaRLevel',.99)

expand all

User-defined ID for PortfolioData input, specified as the comma-separated pair consisting of 'PortfolioID' and a character vector or string. PortfolioID name-value pair argument sets the PortfolioID property.

If PortfolioData is a numeric array, the default value for PortfolioID is 'Portfolio'. If PortfolioData is a table, PortfolioID is set by default to the corresponding variable name in the table.

Data Types: char | string

VaR identifier for VaRData columns, specified as the comma-separated pair consisting of 'VaRID' and a character vector or string. Multiple VaRIDs are specified using a 1-by-NumVaRs (or NumVaRs-by-1) cell array of character vectors or string vector with user-defined IDs for the VaRData columns. VaRID name-value pair argument sets the VaRID property.

If VaRData is a numeric array, the default value for VaRID is 'VaR'. If NumVaRs = 1 or NumVaRs > 1, the default value is 'VaR1', 'VaR2', and so on. If VaRData is a table, 'VaRID' is set by default to the corresponding variable names in the table

Data Types: char | cell | string

VaR confidence level, specified as the comma-separated pair consisting of 'VaRLevel' and a numeric between 0 and 1 or a 1-by-NumVaRs numeric array with values between 0 and 1 for the corresponding columns in VaRData. VaRLevel name-value pair argument sets the VaRLevel property.

Data Types: double

Properties

expand all

Portfolio data for the VaR backtesting analysis, specified as a NumRows-by-1 numeric array containing a copy of the portfolio data.

Data Types: double

VaR data for the VaR backtesting analysis, specified as a NumRows-by-NumVaRs numeric array containing a copy of the VaR data.

Data Types: double

Portfolio identifier, specified as a string.

Data Types: string

VaR identifier, specified as a 1-by-NumVaRs string array containing the VaR IDs for the corresponding columns in VaRData.

Data Types: string

VaR level, specified as a 1-by-NumVaRs numeric array containing the VaR levels for the corresponding columns in VaRData.

Data Types: double

varbacktest PropertySet or Modify Property from Command Line Using varbacktest Modify Property Using Dot Notation
PortfolioDataYesNo
VaRDataYesNo
PortfolioIDYesYes
VaRIDYesYes
VaRLevelYesYes

Object Functions

tlTraffic light test for value-at-risk (VaR) backtesting
binBinomial test for value-at-risk (VaR) backtesting
pofProportion of failures test for value-at-risk (VaR) backtesting
tuffTime until first failure test for value-at-risk (VaR) backtesting
ccConditional coverage mixed test for value-at-risk (VaR) backtesting
cciConditional coverage independence test for value-at-risk (VaR) backtesting
tbfTime between failures mixed test for value-at-risk (VaR) backtesting
tbfiTime between failures independence test for value-at-risk (VaR) backtesting
summaryReport on varbacktest data
runtestsRun all tests in varbacktest

Examples

expand all

varbacktest takes in portfolio outcomes data and corresponding value-at-risk (VaR) data and returns a varbacktest object.

Create a varbacktest object.

 load VaRBacktestData
 vbt = varbacktest(EquityIndex,Normal95)
vbt = 

  varbacktest with properties:

    PortfolioData: [1043x1 double]
          VaRData: [1043x1 double]
      PortfolioID: "Portfolio"
            VaRID: "VaR"
         VaRLevel: 0.9500

vbt, the varbacktest object, contains a copy of the given portfolio data (PortfolioData property), the given VaR data (VaRData property) and all combinations of portfolio ID, VaR ID, and VaR level to be tested (PortfolioID, VaRID, and VaRLevel properties).

Run the tests using the vbt object.

 runtests(vbt)
ans =

  1x11 table

    PortfolioID    VaRID    VaRLevel     TL       Bin       POF       TUFF       CC       CCI       TBF       TBFI 
    ___________    _____    ________    _____    ______    ______    ______    ______    ______    ______    ______

    "Portfolio"    "VaR"    0.95        green    accept    accept    accept    accept    accept    reject    reject

Change the PortfolfioID and VaRID properties using dot notation.

vbt.PortfolioID = 'S&P'
vbt.VaRID = 'Normal at 95%'
vbt = 

  varbacktest with properties:

    PortfolioData: [1043x1 double]
          VaRData: [1043x1 double]
      PortfolioID: "S&P"
            VaRID: "VaR"
         VaRLevel: 0.9500


vbt = 

  varbacktest with properties:

    PortfolioData: [1043x1 double]
          VaRData: [1043x1 double]
      PortfolioID: "S&P"
            VaRID: "Normal at 95%"
         VaRLevel: 0.9500

Run all tests using the updated varbacktest object.

 runtests(vbt)
ans =

  1x11 table

    PortfolioID         VaRID         VaRLevel     TL       Bin       POF       TUFF       CC       CCI       TBF       TBFI 
    ___________    _______________    ________    _____    ______    ______    ______    ______    ______    ______    ______

    "S&P"          "Normal at 95%"    0.95        green    accept    accept    accept    accept    accept    reject    reject

Create a varbacktest object.

 load VaRBacktestData
 vbt = varbacktest(EquityIndex,Normal95)
vbt = 

  varbacktest with properties:

    PortfolioData: [1043x1 double]
          VaRData: [1043x1 double]
      PortfolioID: "Portfolio"
            VaRID: "VaR"
         VaRLevel: 0.9500

vbt, the varbacktest object, contains a copy of the given portfolio data (PortfolioData property), the given VaR data (VaRData property) and all combinations of portfolio ID, VaR ID, and VaR level to be tested (PortfolioID, VaRID, and VaRLevel properties).

Run the tests using the varbacktest object.

 runtests(vbt)
ans =

  1x11 table

    PortfolioID    VaRID    VaRLevel     TL       Bin       POF       TUFF       CC       CCI       TBF       TBFI 
    ___________    _____    ________    _____    ______    ______    ______    ______    ______    ______    ______

    "Portfolio"    "VaR"    0.95        green    accept    accept    accept    accept    accept    reject    reject

Change the PortfolfioID and VaRID properties using dot notation.

vbt.PortfolioID = 'S&P'
vbt.VaRID = 'Normal at 95%'
vbt = 

  varbacktest with properties:

    PortfolioData: [1043x1 double]
          VaRData: [1043x1 double]
      PortfolioID: "S&P"
            VaRID: "VaR"
         VaRLevel: 0.9500


vbt = 

  varbacktest with properties:

    PortfolioData: [1043x1 double]
          VaRData: [1043x1 double]
      PortfolioID: "S&P"
            VaRID: "Normal at 95%"
         VaRLevel: 0.9500

Run all tests using the updated varbacktest object.

 runtests(vbt)
ans =

  1x11 table

    PortfolioID         VaRID         VaRLevel     TL       Bin       POF       TUFF       CC       CCI       TBF       TBFI 
    ___________    _______________    ________    _____    ______    ______    ______    ______    ______    ______    ______

    "S&P"          "Normal at 95%"    0.95        green    accept    accept    accept    accept    accept    reject    reject

Create a varbacktest object that has multiple VaR identifiers with different confidence levels.

load VaRBacktestData
    vbt = varbacktest(EquityIndex,...
       [Normal95 Normal99 Historical95 Historical99 EWMA95 EWMA99],...
       'PortfolioID','Equity',...
       'VaRID',{'Normal95' 'Normal99' 'Historical95' 'Historical99' 'EWMA95' 'EWMA99'},...
       'VaRLevel',[0.95 0.99 0.95 0.99 0.95 0.99]);

Run the summary report for the varbacktest object.

 summary(vbt)
ans =

  6x10 table

    PortfolioID        VaRID         VaRLevel    ObservedLevel    Observations    Failures    Expected    Ratio     FirstFailure    Missing
    ___________    ______________    ________    _____________    ____________    ________    ________    ______    ____________    _______

    "Equity"       "Normal95"        0.95        0.94535          1043            57          52.15        1.093     58             0      
    "Equity"       "Normal99"        0.99         0.9837          1043            17          10.43       1.6299    173             0      
    "Equity"       "Historical95"    0.95        0.94343          1043            59          52.15       1.1314     55             0      
    "Equity"       "Historical99"    0.99        0.98849          1043            12          10.43       1.1505    173             0      
    "Equity"       "EWMA95"          0.95        0.94343          1043            59          52.15       1.1314     28             0      
    "Equity"       "EWMA99"          0.99        0.97891          1043            22          10.43       2.1093    143             0      

Run all tests using the varbacktest object.

 runtests(vbt)
ans =

  6x11 table

    PortfolioID        VaRID         VaRLevel      TL       Bin       POF       TUFF       CC       CCI       TBF       TBFI 
    ___________    ______________    ________    ______    ______    ______    ______    ______    ______    ______    ______

    "Equity"       "Normal95"        0.95        green     accept    accept    accept    accept    accept    reject    reject
    "Equity"       "Normal99"        0.99        yellow    reject    accept    accept    accept    accept    accept    accept
    "Equity"       "Historical95"    0.95        green     accept    accept    accept    accept    accept    reject    reject
    "Equity"       "Historical99"    0.99        green     accept    accept    accept    accept    accept    accept    accept
    "Equity"       "EWMA95"          0.95        green     accept    accept    accept    accept    accept    accept    accept
    "Equity"       "EWMA99"          0.99        yellow    reject    reject    accept    reject    accept    reject    accept

Run the traffic light test (tl) using the varbacktest object.

 tl(vbt)
ans =

  6x9 table

    PortfolioID        VaRID         VaRLevel      TL      Probability      TypeI      Increase    Observations    Failures
    ___________    ______________    ________    ______    ___________    _________    ________    ____________    ________

    "Equity"       "Normal95"        0.95        green     0.77913          0.26396          0     1043            57      
    "Equity"       "Normal99"        0.99        yellow    0.97991          0.03686    0.26582     1043            17      
    "Equity"       "Historical95"    0.95        green     0.85155          0.18232          0     1043            59      
    "Equity"       "Historical99"    0.99        green     0.74996          0.35269          0     1043            12      
    "Equity"       "EWMA95"          0.95        green     0.85155          0.18232          0     1043            59      
    "Equity"       "EWMA99"          0.99        yellow    0.99952        0.0011122    0.43511     1043            22      

Use varbacktest with table inputs and name-value pair arguments to create two varbacktest objects and run the concatenated summary report. varbacktest uses the variable names in the table inputs as PortfolioID and VaRID.

load VaRBacktestData
vbtE = varbacktest(DataTable(:,2),DataTable(:,3:4),'VaRLevel',[0.95 0.99]);
vbtD = varbacktest(DataTable(:,5),DataTable(:,6:7),'VaRLevel',[0.95 0.99]);
[summary(vbtE); summary(vbtD)]
ans =

  4x10 table

     PortfolioID           VaRID           VaRLevel    ObservedLevel    Observations    Failures    Expected     Ratio     FirstFailure    Missing
    _____________    __________________    ________    _____________    ____________    ________    ________    _______    ____________    _______

    "Equity"         "VaREquity95"         0.95        0.94343          1043            59          52.15        1.1314     28             0      
    "Equity"         "VaREquity99"         0.99        0.97891          1043            22          10.43        2.1093    143             0      
    "Derivatives"    "VaRDerivatives95"    0.95        0.95014          1043            52          52.15       0.99712      9             0      
    "Derivatives"    "VaRDerivatives99"    0.99        0.97028          1043            31          10.43        2.9722     28             0      

Run all the tests and concatenate the results.

[runtests(vbtE); runtests(vbtD)]
ans =

  4x11 table

     PortfolioID           VaRID           VaRLevel      TL       Bin       POF       TUFF       CC       CCI       TBF       TBFI 
    _____________    __________________    ________    ______    ______    ______    ______    ______    ______    ______    ______

    "Equity"         "VaREquity95"         0.95        green     accept    accept    accept    accept    accept    accept    accept
    "Equity"         "VaREquity99"         0.99        yellow    reject    reject    accept    reject    accept    reject    accept
    "Derivatives"    "VaRDerivatives95"    0.95        green     accept    accept    accept    accept    accept    reject    reject
    "Derivatives"    "VaRDerivatives99"    0.99        red       reject    reject    accept    reject    accept    reject    reject

Run the pof test and concatenate the results.

 [pof(vbtE); pof(vbtD)]
ans =

  4x9 table

     PortfolioID           VaRID           VaRLevel     POF      LRatioPOF     PValuePOF     Observations    Failures    TestLevel
    _____________    __________________    ________    ______    __________    __________    ____________    ________    _________

    "Equity"         "VaREquity95"         0.95        accept       0.91023       0.34005    1043            59          0.95     
    "Equity"         "VaREquity99"         0.99        reject        9.8298     0.0017171    1043            22          0.95     
    "Derivatives"    "VaRDerivatives95"    0.95        accept    0.00045457       0.98299    1043            52          0.95     
    "Derivatives"    "VaRDerivatives99"    0.99        reject        26.809    2.2457e-07    1043            31          0.95     

References

[1] Basel Committee on Banking Supervision, Supervisory Framework for the Use of 'Backtesting' in Conjunction with the Internal Models Approach to Market Risk Capital Requirements. January, 1996, http://www.bis.org/publ/bcbs22.htm.

[2] Christoffersen, P. "Evaluating Interval Forecasts." International Economic Review. Vol. 39, 1998, pp. 841–862.

[3] Cogneau, Ph. “Backtesting Value-at-Risk: How Good is the Model?" Intelligent Risk, PRMIA, July, 2015.

[4] Haas, M. "New Methods in Backtesting." Financial Engineering, Research Center Caesar, Bonn, 2001.

[5] Jorion, Ph. Financial Risk Manager Handbook. 6th Edition. Wiley Finance, 2011.

[6] Kupiec, P. "Techniques for Verifying the Accuracy of Risk Management Models." Journal of Derivatives. Vol. 3, 1995, pp. 73–84.

[7] McNeil, A., Frey, R., and Embrechts, P. Quantitative Risk Management. Princeton University Press, 2005.

[8] Nieppola, O. “Backtesting Value-at-Risk Models.” Master's Thesis, Helsinki School of Economics, 2009.

Introduced in R2016b

Was this topic helpful?