Code covered by the BSD License  

Highlights from
Power load cycle using GUI

4.0

4.0 | 4 ratings Rate this file 17 Downloads (last 30 days) File Size: 13.17 KB File ID: #10150
image thumbnail

Power load cycle using GUI

by Tamir Suliman

 

25 Feb 2006 (Updated 06 Mar 2006)

Used to calculate the load factor and peak value and plot the results on a daily period basis..

| Watch this File

File Information
Description

The program code is obtained from Haddi Saddat book power system analysis and I've made the GUI.

  The daily load curve of a utility is a composite of demands made by various classes of users.The greatest value of load during a 24-hr period called the peak or the maximum demand.Load factor is a ratio of average load over a designated period of time to the peak load ocuuring in that time.[Haddi Saddat Power System analysis P8].

MATLAB release MATLAB 7.0.4 (R14SP2)
Other requirements We used barcycle function to plot the load cycles. Brcycle.m function is also included with the other files.
Tags for This File  
Everyone's Tags
Tags I've Applied
Add New Tags Please login to tag files.
Comments and Ratings (4)
12 May 2006 Majda Mohamed  
12 May 2006 Mohaned Ibrahim

Do your best man we are waitnig for more

19 Jul 2008 Hatem Diab

thanks... keep it up.

17 Aug 2009 Erdal Bizkevelci  
Please login to add a comment or rating.
Updates
06 Mar 2006

We added barcycle.m file and made some changes to the figure.

Tag Activity for this File
Tag Applied By Date/Time
gui Tamir Suliman 22 Oct 2008 08:16:48
display Tamir Suliman 22 Oct 2008 08:16:48
annotation Tamir Suliman 22 Oct 2008 08:16:48
barcycle Tamir Suliman 22 Oct 2008 08:16:48
gui power load cycle Tamir Suliman 22 Oct 2008 08:16:48
barcycle Dominic Halajian 20 Oct 2009 11:37:02
display mr.harm 10 Feb 2011 13:51:27

Contact us at files@mathworks.com