Code covered by the BSD License  

Highlights from
Power load cycle using GUI

image thumbnail
from Power load cycle using GUI by Tamir Suliman
Used to calculate the load factor and peak value and plot the results on a daily period basis..

barcycle(data)
% This function obtains a plot of the load cycle for a given interval.
% The demand interval and the load must be defined by the variable data
% in a three-column matrix.  The first two columns are the demand
% interval and the third column is the load value. The demand interval
% may be minutes, hours, or month in ascending order.  Hourly intervals
% must be expressed in military time.
%
% Copyright (C) 1998 by H. Saadat.

function barcycle(data)
L=length(data);
tt = [data(:,1) data(:,2)];
t = sort(reshape(tt, 1, 2*L));
PP=data(:,3);
for n = 1:L
P(2*n-1)=PP(n);
P(2*n)=PP(n);
end
plot(t,P)

Contact us at files@mathworks.com