File Exchange

image thumbnail

duration

version 1.0 (2.02 KB) by

Calculate the duration of a distributed job or individual task

0 Downloads

Updated

View License

Takes a distributed job or task and computes the duration from create time to finish time. If the job or task has not finished, it calculates to the current time. For example:

time = duration(job);
duration(job.Task(1))
515 seconds

Although this was tested with R2008a and the MathWorks Job Manager, it ought to work with past releases and other schedulers.

Comments and Ratings (0)

MATLAB Release
MATLAB 7.6 (R2008a)

Download apps, toolboxes, and other File Exchange content using Add-On Explorer in MATLAB.

» Watch video