Power load cycle using GUIDE MATLAB GUI

Used to calculate the load factor and peak value and plot the results on a daily period basis..
719 Downloads
Updated 26 Dec 2012

View License

The daily load curve of a utility is a composite of demands made by various classes of users.The greatest value of load during a 24-hr period called the peak or the maximum demand.Load factor is a ratio of average load over a designated period of time to the peak load ocuuring in that time.[Haddi Saddat Power System analysis P8].
We used barcycle function to plot the load cycles. Brcycle.m function is also included with the other files

Cite As

Tamir Suliman (2024). Power load cycle using GUIDE MATLAB GUI (https://www.mathworks.com/matlabcentral/fileexchange/39624-power-load-cycle-using-guide-matlab-gui), MATLAB Central File Exchange. Retrieved .

MATLAB Release Compatibility
Created with R14SP2
Compatible with any release
Platform Compatibility
Windows macOS Linux

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!
Version Published Release Notes
1.0.0.0