AluAl
Followers: 0 Following: 0
Statistics
8 Questions
0 Answers
RANK
162,418
of 289,878
REPUTATION
0
CONTRIBUTIONS
8 Questions
0 Answers
ANSWER ACCEPTANCE
25.0%
VOTES RECEIVED
0
RANK
of 19,604
REPUTATION
N/A
AVERAGE RATING
0.00
CONTRIBUTIONS
0 Files
DOWNLOADS
0
ALL TIME DOWNLOADS
0
RANK
of 144,254
CONTRIBUTIONS
0 Problems
0 Solutions
SCORE
0
NUMBER OF BADGES
0
CONTRIBUTIONS
0 Posts
CONTRIBUTIONS
0 Public Channels
AVERAGE RATING
CONTRIBUTIONS
0 Highlights
AVERAGE NO. OF LIKES
Feeds
Question
Integrate slope of a curve
I have an equation for the slope of the curve, (Flux of gas through a metal hollow cylinder) dq/dt = constant*SQRT(P1) I w...
7 years ago | 0 answers | 0
0
answersQuestion
Error in solve function - constraining variables
DATA: Available in the attached excel sheet, T900(1) = cellB3; T900(2) = cellB4; T1000(1) = cellC3 so on and so forth! ...
8 years ago | 1 answer | 0
1
answerQuestion
How to optimize model parameters with simultaneous equations?
DATA: Available in the attached excel sheet, T900(1) = cellB3; T900(2) = cellB4; T1000(1) = cellC3 so on and so forth! Numera...
8 years ago | 0 answers | 0
0
answersQuestion
Simultaneously fitting three equations to get model parameters?
DATA: Available in the attached excel sheet, T900(1) = cellB3; T900(2) = cellB4; T1000(1) = cellC3 so on and so forth! Numera...
8 years ago | 1 answer | 0
1
answerQuestion
Comparing three pairs of values simultaneously so that they give constant values that fit all three!
I have observed K values at three different temperatures through a metal. Assuming certain values for A and B in the equation be...
8 years ago | 1 answer | 0
1
answerQuestion
Estimate constants by comparing model calculations with observed?
My calculated flux values are [3.0801E-05;6.81905E-05;8.3553E-05] respectively for T=[1173.15;1273.15;1373.15] fo...
8 years ago | 0 answers | 0
0
answersQuestion
Curve prediction based on given curves
I have 4 curves of Temperature versus distance. I want to develop a code which would predict the curve for a given initial tempe...
8 years ago | 0 answers | 0
0
answersQuestion
I have an observed curve. By guessing the values of the constant A and B in the equation I can get a calculated curve. i want to optimize the calculated and observed curve such that I can get the precise values of A and B. How do I do it?
dmdt=(pil*(10^(A+B/T))*sqrt(pressure_900))/lnreri I have experimentally calculated dmdt versus time and got a decay plot. I a...
8 years ago | 1 answer | 0