E-Fi - an LTE and WiFi coexistence mechanism

E-Fi (Evasive Wi-Fi) main code - an LTE and WiFi coexistence mechanism in the Unlicensed band
567 Downloads
Updated 21 Jun 2018

This project contains the base code for the E-Fi mechanism, a research project from Northeastern University in the Genesys Lab in collaboration with the Mathworks inc. The formal paper is published in the IEEE Transactions of Mobile Computing (TMC) [1]. E-Fi allows Wi-Fi devices to coexist with LTE on the same band without requiring any changes on the LTE and Wi-Fi Physical Layer (unlike Listen-Before-Talk or CSAT) by extending its capabilities with the WiFi Direct Standard, which allows for a multi-hop communication, and scheduling its transmissions within Almost Blank Subframes (ABS) (an Inter-cell Interference coordination mechanism present in LTE Release 10). The E-Fi mechanism can be summarized into the following steps:
1. Packet Success Rate (PSR) evaluation based on received power (Prx) and Signal-to-Noise Ratio (SINR).
2. Node Pre-categorization (Relay, Wi-Fi Direct Client or Regular Client).
3. Device discovery and PSR exchange.
4. Node Grouping and ABS distribution.
[1] C. Bocanegra, T. E. Kennouche, Z. Li , L. Favalli, M. Di Felice and K. Chowdhury, "E-Fi: Evasive Wi-Fi Measures for Surviving LTE within 5GHz Unlicensed Band," in IEEE Transactions on Mobile Computing, Accepted June 18 2018.

Cite As

Carlos Bocanegra (2024). E-Fi - an LTE and WiFi coexistence mechanism (https://github.com/MathworksProjects/LTE-WiFi-Coexistence), GitHub. Retrieved .

MATLAB Release Compatibility
Created with R2016a
Compatible with any release
Platform Compatibility
Windows macOS Linux

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Versions that use the GitHub default branch cannot be downloaded

Version Published Release Notes
1.0.0.0

Uploaded descriptive image (logo) for the project.
Matlab required Release is R2016a or newer.
Uploaded descriptive image (logo) for the project.

- Update the reference for the accepted paper. The research project has come to an end after the acceptance.

To view or report issues in this GitHub add-on, visit the GitHub Repository.
To view or report issues in this GitHub add-on, visit the GitHub Repository.