You are now following this Submission
- You will see updates in your followed content feed
- You may receive emails, depending on your communication preferences
A 11 kV, 50 Hz three-phase generator (star grounded) rated at 50 kW is connected to bus-1. A 400V, 50 Hz, three-phase load (star grounded) rated at (100 kW + j 8 kVAr) is connected at bus-2. Bus-1 and bus-2 are connected by an 11 kV /400 V, 50 Hz, 100 kVA, three-phase delta-to-star (grounded) transformer. Considering the different types of faults at bus-1, this project is useful for analysing the three-phase voltages and currents of bus-1 and bus-2.
Cite As
Dr Varaprasad Janamala (2026). Fault Analysis Using Two Bus Power System (https://www.mathworks.com/matlabcentral/fileexchange/160401-fault-analysis-using-two-bus-power-system), MATLAB Central File Exchange. Retrieved .
General Information
- Version 1.0.0 (39.1 KB)
MATLAB Release Compatibility
- Compatible with any release
Platform Compatibility
- Windows
- macOS
- Linux
| Version | Published | Release Notes | Action |
|---|---|---|---|
| 1.0.0 |