The real time and sample time do not match in the simulink scope.
Show older comments

For example, I set the sample time to 0.5 seconds. Does that mean there are two types of data per second?
However, if you look at the actual data being extracted, 0.5 seconds becomes 1 second(in real time), and a graph is drawn on the x-axis 60-second graph for 120 seconds(in real time).
Even if the amount of calculation becomes large, the 0.5 second becomes more than 1 second(in real time), resulting in 180 seconds, 200 seconds(in real time), or more on the 60-second axis.
The most curious thing is to distort the time axis as I want.
For example, the 60-second axis is extended to 200 seconds of the real time it took to actually extract data.
Accepted Answer
More Answers (0)