Redesigned Simulink Test Manager (Tech Preview)
R2026bNote
The redesigned Simulink® Test Manager is a tech preview in R2026b. The primary purpose of the tech preview is to provide early access to the most common testing workflows. For more information about supported workflows, see Overview of the Redesigned Simulink Test Manager (Tech Preview).
To enable the feature, click the New Test Manager button in the
existing Test Manager or use the sltest.stmv2.open function at
the command line.
The Simulink Test Manager has a new user interface, improved performance, and is easier to use. The redesigned Simulink Test Manager introduces:
Reusable test artifacts that eliminate duplicating configuration across test cases
Faster test execution using fast restart and improved parallel execution
Text-based file formats that are easier to diff and merge
A separate results app with automatic results persistence across sessions
Objects
Functions
Topics
- Overview of the Redesigned Simulink Test Manager (Tech Preview)
Learn about features, file types, opening, creating and importing tests, and limitations of the redesigned Test Manager. (Since R2026b)
- Redesigned Simulink Test Manager User Interface (Tech Preview)
Learn about the user interface sections and settings of the redesigned Test Manager. (Since R2026b)
- Create and Run Tests Using the New Simulink Test Manager (Tech Preview)
Create a test, run a logical assessment and a back-to-back test, and view results in the redesigned Test Manager. (Since R2026b)