Main Content

Test and Measurement

5G NR waveform generation, visualization, and transmitter performance analysis

5G Toolbox™ provides waveform generation and analysis capabilities.

  • Generate, impair, and visualize uplink and downlink waveforms, test models, and FRCs programmatically or by using the 5G Waveform Generator app.

  • Analyse waveform quality and obtain metrics. For example, you can measure error vector magnitude (EVM), adjacent channel leakage ratio (ACLR), and obtain quality metrics based on channel state information reference signals (CSI-RS).

  • Characterize the impact of RF impairments in NR transmitters and receivers.

  • Perform carrier aggregation (CA): generate, aggregate, and demodulate multiple 5G NR carriers.

Apps

5G Waveform GeneratorCreate, impair, visualize, and export 5G NR waveforms

Blocks

Waveform From Wireless Waveform Generator AppWireless waveform source exported to Simulink

Functions

expand all

nrWaveformGeneratorGenerate 5G NR waveform
nrDLCarrierConfig5G downlink waveform configuration parameters
nrSCSCarrierConfigSCS carrier configuration parameters for 5G waveform generation
nrWavegenBWPConfigBWP configuration parameters for 5G waveform generation
nrWavegenSSBurstConfigSS burst configuration parameters for 5G waveform generation
nrWavegenPDSCHConfigPDSCH configuration parameters for 5G waveform generation
nrPDSCHDMRSConfigPDSCH DM-RS configuration parameters
nrPDSCHPTRSConfigPDSCH PT-RS configuration parameters
nrCORESETConfigControl resource set (CORESET) configuration parameters
nrSearchSpaceConfigSearch space set configuration parameters
nrWavegenPDCCHConfigPDCCH configuration parameters for 5G waveform generation
nrWavegenCSIRSConfigCSI-RS configuration parameters for 5G waveform generation
nrWaveformGeneratorGenerate 5G NR waveform
nrULCarrierConfig5G uplink waveform configuration parameters
nrSCSCarrierConfigSCS carrier configuration parameters for 5G waveform generation
nrWavegenBWPConfigBWP configuration parameters for 5G waveform generation
nrWavegenPUSCHConfigPUSCH configuration parameters for 5G waveform generation
nrPUSCHDMRSConfigPUSCH DM-RS configuration parameters
nrPUSCHPTRSConfigPUSCH PT-RS configuration parameters
nrWavegenPUCCH0ConfigPUCCH format 0 configuration parameters for 5G waveform generation
nrWavegenPUCCH1ConfigPUCCH format 1 configuration parameters for 5G waveform generation
nrWavegenPUCCH2ConfigPUCCH format 2 configuration parameters for 5G waveform generation
nrWavegenPUCCH3ConfigPUCCH format 3 configuration parameters for 5G waveform generation
nrWavegenPUCCH4ConfigPUCCH format 4 configuration parameters for 5G waveform generation
nrWavegenSRSConfigSRS configuration parameters for 5G waveform generation

Topics

5G NR Waveform Generation

Get an overview of 5G NR waveform generation workflows and the waveform types that you can generate.

Featured Examples